Brandon Downtown Waterline Project Going Smoothly

By Amanda Gosselin  |  April 24, 2014  |  Featured News

We are pleased to share that the Brandon Downtown Waterline Project is going well.  The Rutland Herald ran an article written by Bruce Edwards on April 23, 2014 called “Water Project Going Smoothly”.  If you have a subscription to this paper, it is a great read.  In the article, the Town Manager, Robin Bennett is quoted as saying, “We’ve been pleased.  They’re on schedule at this point.”  A+E’s resident project representative, George Dupont, shares his positive experience to date, along with a few business owners who are pleased with the low level of construction-related disruption at this time.  To read more about the project, check out the Town of Brandon’s website page.

This entry was posted in Featured News. Bookmark the permalink.