See what we have been up to
Project Highlights
Explore our featured projects and see how we’re delivering innovative water, wastewater, and stormwater solutions for communities. From planning to implementation, our expertise drives results.
South Burlington Storage Tank

Construction is currently underway on the City of South Burlington’s new 2.1 million gallon welded steel water storage tank. The project will provide increased storage capacity and improved system reliability for the City’s High Service area and help support CWD’s vast distribution network across Chittenden County. A+E was originally selected to conduct an investigatory study…
St Albans Gravel Wetland

A+E provided final design specifications and plans for rehabilitation of the stormwater practice located in the Tanglewood neighborhood of the Town of St. Albans. This stormwater system improvement project was located in a suburban neighborhood and outlets to the Rugg Brook. The pre-existing practice was built in the 1990’s and was not compliant with current…
Fair Haven WWTF

A+E worked with the Town of Fair Haven to identify and evaluate a number of refurbishment alternatives including the possibility of converting the existing treatment facility to a pump station and collaborating with a neighboring community. We produced a combined Preliminary Engineering Report / Evaluation Study which identified several improvements including: A new automatic fine…
Brandon WWTF Upgrade

A comprehensive refurbishment project was completed at the Brandon WWTF to address aging infrastructure, enhance preliminary treatment, improve secondary treatment, and increase operator flexibility. The project was joint funded by the VT CWSRF and USDA RD programs and construction was completed by Naylor and Breen. Key elements of the project include: Screening Expansion of a…

